Sucker Creek Raw Water Intake Line Project
Project Name: Sucker Creek Raw Water Intake Line Project
Contract Value: $ 4,175,400
Project Location: Sucker Creek First Nation, located on the South Shores of Lesser Slave Lake
Project Description: Installed 4200m of 250Ø DR11 HDPE Raw Water Intake Line, complete with 3000Ø x 10m deep Wet Well, and Raw Water Intake Structure. 3400m was installed from the Intake Structure to the shore of Lesser Slave Lake, the remaining 800m was installed In ground on the shore.
Owner: Sucker Creek First Nation
Consulting Engineer: UMA / AECOM
Project Manager: Terran Sandwith & Mark Wright, GS Construction