Sucker Creek Raw Water Intake Line Project


Project Name: Sucker Creek Raw Water Intake Line Project

Contract Value: $ 4,175,400

Project Location: Sucker Creek First Nation, located on the South Shores of Lesser Slave Lake

Project Description: Installed 4200m of 250Ø DR11 HDPE Raw Water Intake Line, complete with 3000Ø x 10m deep Wet Well, and Raw Water Intake Structure. 3400m was installed from the Intake Structure to the shore of Lesser Slave Lake, the remaining 800m was installed in-ground on the shore.

Owner: Sucker Creek First Nation

Consulting Engineer: UMA / AECOM

Project Managers: Terran Sandwith & Mark Wright, GS Construction