Sucker Creek Raw Water Intake Line Project
Project Name: Sucker Creek Raw Water Intake Line Project
Contract Value: $ 4,175,400
Project Location: Sucker Creek First Nation, located on the South Shores of Lesser Slave Lake
Project Description: Installed 4200m of 250Ø DR11 HDPE Raw Water Intake Line, complete with 3000Ø x 10m deep Wet Well, and Raw Water Intake Structure. 3400m was installed from the Intake Structure to the shore of Lesser Slave Lake, the remaining 800m was installed in-ground on the shore.
Owner: Sucker Creek First Nation
Consulting Engineer: UMA / AECOM
Project Managers: Terran Sandwith & Mark Wright, GS Construction