Town of Westlock, Southview Infrastructure Improvements


Project Name: Town of Westlock, Southview Infrastructure Improvements

Contract Value: $ 2,057,849.93

Project Location: 101 and 102 Ave, between 100 St and 97 Street, Westlock Alberta.

Project Description: Performing as sub-contractor, removed and disposed 13,400m2 asphalt, C&G and Sidewalk. Removed and replaced 345m of Ø200 sanitary main. 431m of CIPP liner. Pipe burst 710m of Ø200 water and 187m HDD. 44 service replacements with 386m of CIPP service lining. Installed 6 hydrants and 12 valves.

Owner: Town of Westlock

Consulting Engineer: WSP

Project Manager: Mike Durdle, GS Construction

Other Projects