2023 Sanitary Catch Basin Removals Location 13 & 15

  • Location Edmonton, Alberta
  • Description
    • Installation of 185m of new Storm line (250mm & 300mm PVC)
    • Installation of new CBMH’s and MH’s (1200mm)
    • 600m² of back alley surface restoration
  • Owner EPCOR Water Services