2023 Arterial Collector Renewal Open Cut

  • Location Edmonton, Alberta
  • Description
    • 5 Mainline Repairs up to 5.0m in Depth
    • 4 CB Lead Replacements
    • 57 MH Appurtenances repairs and replacements
    • All work was completed on various Arterial and collector roads in the City of Edmonton, including Yellowhead Trail, Whitemud Drive and Fox Drive.
  • Owner EPCOR Water Services